Phillips Pointe HOA
  • Home
  • Architectural Review Board
  • Facebook Group

Architectural Review Board

The Architectural Review Board must approve any exterior changes to our homes and yards (shed, patio, fence, shutter color, etc.). If you are planning on making any changes, please submit an approval request using the link below.
Online Request Form
If you choose, you can download, print, and fill out the ARB Review Request Form and submit it to the Review Board at PO Box 1802 Fuquay Varina, NC 27526
ARB Request Form
When completing the forms, ALL fields must be completed and ALL requested collateral attached. If you do not provide the required information, to include materials to be used, dimensions or fence height and type, a short description of what you want to paint, build or install, placement location on a plot map of your property, along with paint chip examples, your request will be delayed and may have to be resubmitted once you have all the items ready for submission.

If you are a renter, please note:​ All requests must be made by the named owner of the property and all communication must be through them. No exceptions to this rule will be make. Verification of the named deed holder will be completed by reviewing county records.

Architectural Review Board (ARB) Members

​​Chairperson: Ed Owen
Ron Swietek
Deb Golden
Email Board

Special Notices

Mailboxes, Swimming Pools, Satellite Dishes

Link To Notice

Windows And Shutters

Download Notice

Reminders For All ARB Requests

- Include the dimensions of all decks/sheds/patios.
- Include the type of material that will be used on all projects.
- Be sure to indicate if your shed will use siding or be painted.
- Include the color of any siding or paint.
​- Siding should match the siding of your house as should paint color.
- Give the height of your requested fence.
- Tell us what material your fence will be; chain link fences are not permitted.
- Indicated the type of fence you will have: dog ear, rainbow, picket, etc.
When planning, remember that there is typically a required set-back from your property line to where you can place your structure. The town can give you direction on that. As of 2009, it is 10ft. from the rear property line and 8ft. from the side property line.

Your property could have differing requirements based on size and shape. Check with the Town Of Fuquay Varina for further details to make sure you are in complaince.
- Permits are required for all decks, sheds, and permanent structures. Contact the Town Of Fuquay Varina Inspections Department to obtain any and all permits.
- The Town will require an official plot plan with placement of your structure when requesting a permit.
- Approvals given by the Phillips Points ARB are only for purpose of conforming with our Covenants and do not release you from any town building law.
The ARB requires a diagram of your plot to show placement of your construction; a copy of the official plot plan should be used if you are required to obtain a permit.
Review our By-Laws and Covenants for further information.
Make sure to submit any and all files, images, or diagrams to the ARB when making an architectural request.

Approved Siding Colors

Picture

Thank you for visiting the Phillips Pointe HOA website!

If you have any questions or need more information, please contact the Board of Directors, call Angie (919-218-5011), or Email the Board.
Copyright 2021. All Rights Reserved.
  • Home
  • Architectural Review Board
  • Facebook Group